DEEP EXCAVATION & UNDERGROUND WORKS

Deep Excavation & Underground Monitoring

Monitor retaining systems, ground movement, groundwater and adjacent assets through construction-stage instrumentation and engineering data review.

Excavation and lateral support

Understand the ground–structure interaction

Deep excavation projects place retaining systems, temporary supports, groundwater conditions and surrounding assets into a changing engineering environment. Excavation sequence, dewatering, ground variability and construction workmanship can all influence movement and performance.

A robust monitoring arrangement should be developed alongside the excavation design and construction method. It should help the project team check whether measured behaviour is consistent with the design assumptions and whether further review or action is required.

Retaining system

Wall movement and support response

Observe lateral deformation and, where specified, the loads or strains in critical support elements.

Groundwater

Drawdown and pore pressure

Track groundwater response and identify changes that may influence excavation stability or nearby ground conditions.

Surrounding assets

Settlement and structural response

Monitor selected buildings, roads, utilities and structures that may be affected by the works.

GEOOE’s related application areas include Excavation and Retaining Structures (ERSS), ground movement, subsidence and tunnel monitoring.

What can change during excavation

The main mechanisms to consider

Retaining wall deformation

Wall deflection and ground movement may evolve as excavation proceeds and support levels are installed, preloaded or altered.

Groundwater drawdown

Pumping and groundwater inflow can change pore pressures and may affect adjacent ground or structures, depending on geology and hydraulic connectivity.

Support loads and strains

Struts, anchors and other critical support elements may experience changing loads during staged excavation and construction.

Movement of nearby assets

Settlement, tilt, cracking or vibration may affect adjacent buildings, roads, buried services and sensitive receivers.

The Hong Kong Geotechnical Engineering Office’s Deep Excavation Design and Construction (GEO Publication No. 1/2023) discusses instrumentation for excavation and lateral support works, including movement and vibration of sensitive receivers, groundwater level and piezometric pressure, embedded-wall deflection, and loads or strains in critical support elements.

Monitoring is one part of the engineering control system. It does not replace adequate design, construction supervision, ground investigation, groundwater control or emergency arrangements.

Select instruments by measurement objective

Instrumentation for deep excavation monitoring

The following methods are commonly considered for excavation monitoring. Final instrument types, locations, installation details, frequency and acceptance criteria must follow the project design and applicable requirements.

Measurement objectiveTypical instrument or methodWhat the data helps assess
Subsurface horizontal deformationInclinometersMovement profile with depth and changes associated with excavation stages.
Groundwater levelStandpipesGroundwater level trends and potential drawdown response.
Pore-water pressureVibrating-wire piezometersPore-pressure changes in selected geological strata or response zones.
Surface settlement and displacementSurvey markers and precise/automated survey methodsMovement of the ground surface and selected surrounding assets.
Structural crack or tiltCrackmeters and tiltmetersChanges in selected crack widths or orientation/tilt at monitored structures.
Support-system performanceLoad or strain instrumentation where specifiedChanges in loads or strains in critical struts, anchors or structural elements.

Instrument selection should consider measurement accuracy, reliability, response time, site conditions, installation constraints and maintainability. For groundwater monitoring, the response zone and geological layer matter: a sensor installed in the wrong stratum may not represent the hydraulic condition relevant to the excavation.

Explore GEOOE’s geotechnical instrumentation, ground monitoring and structural monitoring technical areas.

Construction-stage control

A monitoring workflow that follows excavation sequence

01

Review the design basis

Understand the ground model, excavation geometry, support system, dewatering plan and surrounding assets.

02

Establish baseline data

Install and verify instruments, confirm reference points and obtain baseline observations before relevant works.

03

Align with work stages

Plan measurement frequency around excavation depth, support installation, preload, pumping and other critical activities.

04

Review and respond

Check data quality, compare trends with design expectations and follow the approved trigger and action plan.

A monitoring programme is most useful when readings can be interpreted against the construction record. The timing of excavation, strut installation, groundwater pumping and nearby works should be traceable alongside the measurements.

  • Defined instrument locations and identifiers
  • Documented baseline and reference conditions
  • Calibration and installation records
  • Consistent units, timestamps and survey references
  • Construction-stage and event logs
  • Agreed review, notification and escalation responsibilities

Reliable readings before interpretation

Data quality, reporting and engineering review

A measurement is only useful when its origin, method, timing and quality are understood. Monitoring data should be checked before it is compared with trigger levels or used to support a construction decision.

Traceability

Maintain instrument IDs, location references, installation records, calibration details, operator records and timestamps.

Quality assurance

Identify missing values, outliers, drift, inconsistent units, survey-reference changes and instrument faults.

Engineering interpretation

Read trends in the context of construction stages, ground conditions, rainfall, groundwater and nearby activities.

Thresholds should be established by the responsible project professionals and linked to specific actions. A dashboard or alert is not a substitute for checking the measurement, understanding the mechanism and confirming who is responsible for the response.

For further technical reading, visit the GEOOE Technical Hub and the automated monitoring systems page.

GEOOE engineering perspective

An instrumentation-led approach to excavation data

GEOOE focuses on geotechnical instrumentation, infrastructure sensing and engineering intelligence. For deep excavation projects, this means connecting instrument selection and monitoring architecture with the actual engineering questions: wall behaviour, groundwater response, support performance and movement of surrounding assets.

Instrumentation and monitoring systems

Explore the instrumentation platform, including ground and structural monitoring and automated monitoring topics.

The required scope, deliverables, professional responsibilities and any independent review appointment must be agreed for each project. GEOOE does not imply that a general website description replaces the project’s appointed registered professionals or statutory approvals.

Common questions

Deep excavation monitoring FAQs

Which instrument is used to monitor retaining-wall movement?
Inclinometers are commonly used to measure subsurface horizontal deformation. Depending on the design and geometry, other survey or structural monitoring methods may also be required. The instrument layout and datum must be appropriate to the expected movement mechanism.
Why may more than one groundwater instrument be needed?
Groundwater conditions can vary between geological layers. Standpipes and piezometers may need to be installed at selected depths or response zones to distinguish groundwater-level changes from pore-pressure changes in particular strata.
Should monitoring frequency remain constant throughout excavation?
Not always. Frequency may need to reflect excavation stages, support installation, pumping, nearby works, observed trends and the project’s required response time. The approved monitoring plan should define the frequency and any conditions for increasing it.
Can a monitoring dashboard determine whether excavation is safe?
No. A dashboard can present readings and flag conditions, but safety decisions require verified data, engineering interpretation, comparison with the approved design and action criteria, and review by the responsible professionals.

Official information

Hong Kong technical and regulatory references

Always consult the latest editions, amendments, approved drawings and project specifications. This page is general engineering information and is not a project-specific design or approval.

Discuss a project

Share the excavation and monitoring requirements

For a deep excavation enquiry, share the excavation depth and sequence, retaining system, ground and groundwater information, nearby assets, proposed instruments and any existing monitoring requirements.

Business enquiries: [email protected]